Cabinet and MDF Room Migration

Project Data

LocationOtay Industrial Park, Tijuana
Year Completed2021
CategoryIT
ClientInternational maquiladora

Have a similar project in mind?

Get a quote for industrial solutions, structured networks or custom civil works.

Talk to a Specialist
Cabinet and MDF Room Migration - Imagen 1
Cabinet and MDF Room Migration - Imagen 2
Cabinet and MDF Room Migration - Imagen 3
Cabinet and MDF Room Migration - Imagen 4
1 / 4

Case Description

Full migration of the main telecommunications room (MDF) at a maquiladora plant: removal of the legacy infrastructure, installation of 4-post racks and a Hubbell wall-mount cabinet, re-pulling of Cat 6 cabling, and dressed, labeled reconnection of every service within controlled maintenance windows, with no interruption to plant operations.

Project Highlights

  • 4-post racks and cable ladder rack installed in the MDF room
  • Re-pull of Black Box GigaTrue 550 Cat 6 cabling
  • Dressing, labeling and reconnection of Hubbell patch panels
  • Power backup with Vertiv UPS and Eaton automatic transfer switch
  • Migration executed in night windows with zero production downtime